Completed projects

An implementation of a range of measures to control the thickness of the ice at the berths OPP during construction LNG plant on the project: "Construction of a seaport near the settlement Sabetta on t
An implementation of a range of measures to control the thickness of the ice at the berths OPP during construction LNG plant on the project: "Construction of a seaport near the settlement Sabetta on the Yamal Peninsula, including the creation of a navigable approach channel to the Gulf of the river Ob " in the development of South Tambeyskoye gas condensate field.
Подробнее →

An implementation of major repair of resuscitation rooms and intensive care unit of St. Petersburg State budget health institution "City Drug Hospital"
In 2015 the company "Avangard Stroy Trest" performed a range of works on major maintenance of reanimation and premises intensive care units of St. Petersburg GBUZ "HDD" at the address: St. Petersburg, 23-25, letter. A, 4-th Line VO.
Подробнее →

Overhaul of the heating networks while preserving existing trace of the second flanges of valves on the manifolds boiler (point 1) to the first flange of valves on the heat input of TP-1 (point 3) and
In 2015 the company "Avangard Stroy Trest" has performed works on an overhaul of the heating networks with the preservation of the existing trace Clinical and polyclinic complex "FGBU SZFMITS named after VA Almazov » under the authority of Ministry of Health of Russia : 2, Akkuratova st., St.Petersburg.
Подробнее →

The boiler with the capacity of of 20.484 MW, St. Petersburg, Peterhof Shosse
In 2013-2015 the company "Avangard Stroy Trest" completed the design and modernization of the steam boiler plant, located on the territory of the tobacco factory "Petro" LLC at the address: St. Petersburg, 71, lit.... B Peterhof Shosse, with the installation of new additional boiler. Boiler is designed to produce thermal energy for the needs of heating and hot water systems of premises tobacco factory.
Подробнее →

The boiler with the capacity of 4.5 MW, Kursk region, w. Malaya Loknya
In 2014, the company "Avangard Stroy Trest" has performed a full range of construction and installation works on the project: "Construction of a boiler-house engineering networks with PKU IR 11 FPS Russia's Kursk Region", located at: Kursk region, w. Malaya Loknya.
Подробнее →

The boiler with the capacity of 3.5 MW, 3rd Konnaya Lakhta str., St. Petersburg
In 2014 the company "Avangard Stroy Trest" performed work on the expansion of the existing building of the boiler room and installation of the boiler unit in the new building at the facility located at: 38, 3rd Konnaya Lakhta str., St. Petersburg.
Подробнее →

An implementation of the project of reconstruction of pipelines of heating and hot water supply
In 2014, the "Avangard Stroy Trest" company completed the project of reconstruction of the main heating and hot water supply system in the block 3 Rzhevka-Porokhovye from TC-3 to 6, bldg. 1, Lenskaya str.; in the block 5 Rzhevka-Porokhovye to 10, bldg. 1, Lenskaya str., 14, 16, bldg. 1, Lenskaya str.; in the block 4 Rzhevka-Porokhovye to 32, bldg. 1 and 2, 34, 36 Kommuny str., 49, bldg. 1, 51, bldgs. 2,3,4, 53 bldg. 3, 53/38 Entuziastov avenue within the targeted investment program of St. Petersburg for 2013 and the planning period of 2014 and 2015.
Подробнее →

An implementation of the project of the main heating system reconstruction in the block 12 Shuvalovo-Ozerky, from the TC-29a of the main heating system in Lunacharsky Avenue to MSP in the block N 5 in
In 2014, the "Avangard Stroy Trest" company completed the project of reconstruction of the main heating system within the targeted investment program of St. Petersburg for 2013 and the planning period of 2014 and 2015.
Подробнее →

An implementation of the project of the main heating system reconstruction from TC-1 and near the 6-th Vyborgskaya boiler house to TC-2 in the block 35, TC-1 in the block 39: TC-7 near the Sputnik Ho
In 2014 the "Avangard Stroy Trest" company completed the project of reconstruction of the main heating system within the targeted investment program of St. Petersburg for 2013 and the planning period of 2014 and 2015.
Подробнее →

An implementation of the project of the main heating system reconstruction in Academician Baykov street, Svetlanovsky avenue to TC-11 (17) in the block 16a and the block 10 of Grajdanka from the TC-4
In 2014 the "Avangard Stroy Trust" company completed the project of reconstruction of the main heating system within the targeted investment program of St. Petersburg for 2013 and the planning period of 2014 and 2015.
Подробнее →